![]() The council’s original tender document requested that the project be carried out in BIM and a set of Employer’s Information Requirements was provided with the intention of one day enabling the building to be operated and maintained using BIM.īIM protocols, standards and software formats were agreed at the outset and 3D models, with embedded data, were produced in Revit at RIBA Stage 3 by the main design partners, architect Hazle McCormack Young, main contractor Baxall Construction, and consulting building services engineer Crofton Design.Ī CDE was not set up for the project. ![]() The £3.5m design and build, one form entry primary school functioned as a BIM proving ground for Kent County Council, providing valuable lessons in building services coordination, material cost take-offs and the value of a Common Data Environment.